15 May 2020

May 2020: Installed in Poland two complete self-reacting lines

Just tested by our engineers in Poland two more complete self-reacting lines to manufacture  pre-stressed girders and double T-slabs.

Such self-reacting formworks have stressing force respectively 600 ton and 1000 ton.

 

These formworks especially designed by Olmet Italy srl were installed onto the industrial floor of the Buyer’s workshop without any need for digging pits or any special flooring, as the formwork chassis itself resists the pulling force.