18 July 2024

INSTALLATION COMPLETED IN FRANCE: DOUBLE FORMWORK FOR COLUMNS

Olmet has just completed the installation of a double formwork for columns in France.

These kind of machines are extremely versatile and easy-to-use; the fast assembling system for formwork components to manufacture the console or to change the pre-cast element section, allows to change the type of element to be manufactured.

The console can be made in all the four sides of the formwork, in any position and along the entire length.

The unlocking/locking movements of the side elements or shutters and the bottom plate lifting to change the section are operated by means of hydraulic systems.

The concrete curing is accelerated by means of heating the formwork by steam circulating inside finned pipes.

Technical details:

  • Length of casting decks – 25.5 mt.
  • Sections that can be manufactured: min. 30 x 30 cm. to max. 100 x 100 cm.
  • Electro-hydraulic automatic.